The following proposed projects shall require a Site Development Permit prior to the issuance of a building permit or a demolition permit:
A. Any new building or structure exceeding one hundred twenty (120) square feet.
B. Any addition to an existing building or structure that adds fifty percent (50%) or more to the existing square footage of the building or structure.
C. Any building renovation or alteration affecting fifty percent (50%) or more of the existing square footage of the building or structure.
D. Any building demolition affecting fifty percent (50%) or more of the existing square footage of the building or structure.
E. Any additions or alterations to the second story of an existing two-story building.
F. Any additions of a second story to an existing single story building.